Skip to content
+263 772 498 855 +263 776 899 858 08 Pollet Avenue, Belvedere, Harare
Chat with usWHATSAPP · ONLINE
Environmental Management & Safety

Every Structure
Has A Footprint.

We measure that footprint before construction starts and manage it through to decommissioning, assessed against WHO guidelines and Zimbabwean regulations.

Home/Services/Environmental
Environmental Impact Assessment

How We Assess
A Project's Impact.

An EIA identifies and assesses a project's potential environmental impacts at each phase: construction, operation and decommissioning. Our report describes the project with maps and diagrams, its layout and size, the planned infrastructure, staffing and support facilities, operation and maintenance, and the off-site investments it will need.An EIA assesses a project's impacts through construction, operation and decommissioning, with maps, layout and the infrastructure it needs.

  • Environmental management plans & audits
  • Health & toxicological advice on water parametersToxicological advice on water
  • Water quality, sanitation & surveillance trainingWater quality & sanitation training
  • Natural resource management
Excavated red-soil profile on a site under investigation
Soils · geotechnical sampling
Our Method

From Scoping
To Recommendations.

  1. Scoping

    An early, open process that finds the issues that matter, so time and money are not spent on unnecessary studies.

  2. Fieldwork studies

    Baseline data on water, soils, geology, hydrology, ecology and socio-economics.

  3. Stakeholder concerns

    Consultation with regulators and interested & affected parties, built into the mitigation plan.

  4. Research design

    Interviews, archives and field observations, using several methods to reduce bias.

  5. GIS & reporting

    Digitised maps, buffers and weighted constraints, ending in a map and construction recommendations.

Digital terrain model
Surface water & drainage
Vegetation & habitats
Roads · pipelines · power
Wetland buffer zone

FIG. 01 · GIS LAYERS COMBINED TO FIND AREAS OF ENVIRONMENTAL CONSTRAINT

Fieldwork Sectors

We Measure Baselines
Sector By Sector.

Specialists in each environmental field identify the first impacts. Hover a card to read more.

Waterfall into a forest pool
01 · WATER

Hydrology & Quality

Water courses, wetlands, run-off and flood levels, sampled against WHO and S.I. 6 of 2007.

Red soil site with exposed profiles
02 · SOILS

Soils & Geology

Geochemical sampling sets element baselines, and samples are tested for geotechnical properties.

Stream running through a dense forest
03 · ECOLOGY

Flora & Fauna

Aerial and satellite imagery map vegetation, and we record fauna, endangered species and habitats.

Aerial view of a residential settlement and roads
04 · PEOPLE

Socio-Cultural

Population, livelihoods, social infrastructure and cultural sites, mapped with traditional leaders.

Biodiversity Assessment

Three Levels Of
Ecological Risk.

Genetic level

Risk of extinction or reduced viability from smaller populations, fragmentation, pressure on endemic species, disease and genetic contamination.

Community level

Loss of biodiversity through changes in species composition, removal of keystone species, habitat loss and invasive species.

Ecosystem level

Changes to ecosystem processes, habitat quality, ecological corridors and conservation plans across the landscape.

Occupational Health & Safety

Safety Is Planned
Before Work Starts.

We identify safety and health risks through site visits and interviews, measure dust particle size and composition during construction, and write detailed plans for accidents, fire and working at height.We find safety and health risks on site, measure construction dust, and plan for accidents, fire and working at height.

  • 01Drinking water
  • 02Recreational water
  • 03Raw surface & groundwater
  • 04Waste water

WATER QUALITY STANDARDS WE RESEARCH & ASSESS

Two engineers in high-visibility vests setting up a total station
GPS & modern survey equipment
Plan Responsibly

Need An EIA Or
Environmental Audit?

Talk to our environmentalists and ecologists about scoping, baseline studies and management plans for your project.

Talk To Our Team
Our Location08 Pollet Avenue, Belvedere, Harare
Phone+263 772 498 855
+263 776 899 858
Contact Us Today
Wind turbine on a hillside at sunset